The Challenge
American manufacturing is surging, driven by reshoring, automation, supply chain resilience initiatives, and investment in advanced industries. Manufacturers are expanding capacity and planning new facilities, but many projects now face a common obstacle: access to reliable power. The grid simply can’t keep pace. Behind-the-meter power offers manufacturers a way to secure energy on their schedule rather than the utility’s.
-
500+ Billion
U.S. Investment
Announced manufacturing investment projects in the U.S. to strengthen supply chains and expand capacity.
-
166GW
Power Demand Growth
Projected electricity peak increase by 2030, driven by manufacturing, data centers, electrification and economic growth.
-
128 Weeks
Lead Times
Estimated lead times for electrical transformers, delaying grid expansion projects for utility growth to meet power needs.
Growing Demand
Smart Manufacturing is Accelerating. Power is the Engine.
America’s largest manufacturing investments are also among its most power-intensive: battery plants, semiconductor fabs, specialty chemical facilities, and advanced production operations are attracting billions in investment across the United States. These facilities share a common characteristic: substantial and high-reliability power supplies.
Manufacturers can secure land, labor, equipment, and capital. Increasingly, the limiting factor is access to power. The industries attracting the largest investments often require tens or hundreds of megawatts of reliable electricity, while grid infrastructure development struggles to keep pace. Behind-the-meter power provides an alternative pathway to energy certainty, operational resilience, and accelerated project execution.
Power Primer
Understand Power Needs for Advanced Manufacturing
Each industry has unique power requirements…different load levels, application requirements and tolerance for interruptions. Download our Advanced Manufacturing Power Primer to start your path to behind the meter power solutions.
Frequently Asked Questions
Learn more about Behind the Meter power.
Can a smart manufacturing plant be powered off the grid?
Absolutely. In fact, it may be the preferred option for many reasons.
- Lead times on grid supplied power are stretching out to 5-7 years in many cases
- Behind the meter (private) power is dedicated…you aren’t sharing with other subscribers
- The many points of failure in a traditional grid transmission and distribution chain are eliminated…power is generated onsite, next to its consuming facility.
Can behind the meter power work with the grid?
Yes, it can.
A behind the meter power facility can operate standalone as prime power, in combination with grid power or in a standby or back up mode. Increasingly, due to limited grid availability, behind the meter solutions are moving into the prime position.
When combined with utility power, that’s often referred to as “bridge mode”, in which power supplied to the facility is a combination of a private grid onsite, combined with some utility power.
The configuration of that bridge option is customized to the operating requirements of the facility and the preferences of each customer.
What is behind the meter power?
Behind the meter power is a permanent, baseload power supply customized to a specific location and load. Instead of connecting to a public utility, power generation is accomplished onsite, reducing outage risk, avoiding impact on residential power consumers and tailoring power generation performance to specific load requirements.
Is a private grid reliable for large load applications?
Behind the meter solutions, when designed and engineered for the specific use case, are often more reliable than traditional grid connections. The power profile is designed for the specific load characteristics and there are no other subscribers vying for power at the same time. It’s dedicated power for a dedicated load. In some cases, a local Batter Energy Storage System (BESS) is included to add additional resiliency.
Distributed Power News
Learn More About Power
Distributed Power
How Behind-the-Meter Power May Ease the Grid Crisis
With grid delays stretching up to 10 years, large scale data centers and advanced manufacturing facilities are looking for power closer to home.
-
Distributed Power
What is an Energy Supply Agreement (ESA)?
Your project has a schedule. Don't let power risk it.
Atlas power experts are ready to help you define a behind the meter power strategy to keep you on schedule.